ACE Engineering & Technology
Project name
Improvement of Ventilation System for LS Nikko factory
Client
LS-Nikko
Scope of work
Site survey, Site Measurement, Engineering(Basic, Detail, Fab, Analysis)
Before: Difficulty in controlling the airflow of the factory during the summer season due to humid and hot working conditions inside the factory.
After: Computer Fluid Dynamics (CFD) design analysis techniques change the airflow inside the factory to reduce the temperature in the summertime to create a pleasant working environment to improve workers'.
Field investigation
Field measurement
Engineering Design
Analysis