online catalog

ACE Engineering & Technology

Air Quality Improvement

  • Project name

    Improvement of Ventilation System for LS Nikko factory

  • Client

    LS-Nikko

  • Scope of work

    Site survey, Site Measurement, Engineering(Basic, Detail, Fab, Analysis)

Before: Difficulty in controlling the airflow of the factory during the summer season due to humid and hot working conditions inside the factory.
After: Computer Fluid Dynamics (CFD) design analysis techniques change the airflow inside the factory to reduce the temperature in the summertime to create a pleasant working environment to improve workers'.

  • Field investigation

  • Field measurement

  • Engineering Design

  • Analysis