모바일메뉴열기

사업실적

홈 > 사업분야 > 엔지니어링 사업 > 사업실적

 해양 사업실적
SER. PROJECT NAME CLIENT/YARD SCOPE Part REMARKS Type PROJECT PERIOD
1 KIZOMBA PROJECT EXXON MOBIL/HHI DESIGN PACKAGE HVAC+PIPE DNV FPSO MAR 2005-AUG 2005
2 BP PLUTONIO PROJECT BP ANGOLA/HHI DESIGN PACKAGE HVAC+ARCH+OUTFITTING BV 1.7 MIL BBLS FPSO MAR 2005-AUG 2006
3 KNOC RONG DOI PRJ(LQ) KNOC/HHI DESIGN PACKAGE HVAC+PIPE+CABLE TRAY KR FIXED PLATFORM JUN 2005-AUG 2005
4 SAKHALIN 2B, OPF HHI FULL DESIGN PACKAGE HVAC FIXED PLATFORM OCT 2005-SEP 2006
5 EAST AREA PROJECT HHI PACKAGEDESIGN HVAC+PIPE FIXED PLATFORM OCT 2005-AUG 2006
6 EGP3A PROJECT HHI PACKAGEDESIGN HVAC+PIPE FIXED PLATFORM OCT 2005-MAR 2006
7 AGBAMI FPSO(TOPSIDE) CHEVRON/DSME DESIGN PACKAGE HVAC+PIPE ABS 2.2 MIL BBLS FPSO OCT 2005-MAR 2007
8 AKPO FPSO PROJECT(LQ) TOTAL FINAELF/HHI DESIGN PACKAGE HVAC+PIPE BV 2.3 MIL BBLS FPSO AUG 2006-JUL 2007
9 MOSVOLD DRILL PROJECT SEADRILL/SHI DESIGN PACKAGE HVAC+PIPE FPSO FEB 2007-OCT 2007
10 MOHO FPSO PROJECT TOTAL/HHI DESIGN PACKAGE HVAC+PIPE FPSO OCT 2005-Jun.2006
11 SEADRILL DRILLING RIG PROJECT TOTAL/DSME DESIGN PACKAGE HVAC RIG OCT 2006-MAY 2007
12 PETROSERV GVA 7500 DRILL RIG PETROSERV S.A/DSME DESIGN PACKAGE HVAC 117.9Mx108.8Mx45M MAY 2007-DEC 2007
13 WEST-END PROJECT(LQ) SHI DESIGN PACKAGE HVAC+PIPE MAR 2007-SEP 2007
14 ODFJELL GVA 7500 SEMI, RIG DSME DESIGN PACKAGE CABLE TRAY FIXED PLATFORM SEP 2008-DEC 2008
15 OFON PROJECT TOTAL/HHI DESIGN PACKAGE HVAC+ARCH+OUTFITTING 318K NOV 2008-SEP 2009
16 USAN PROJECT(ALL) TOTAL FINAELF/HHI DESIGN PACKAGE HVAC+ARCH+OUTFITTING BV FPSO OCT 2008-SEP 2009
17 GAZFLOT PROJECT VYBORG SHIPYARD JSC/SHI DESIGN PACKAGE HVAC+ARCH+OUTFITTING FPSO OCT 2008-JUN 2009
18 NR2 PROJECT HHI DETAIL+FAB HVAC+PIPE FIXED PLATFORM FED 2009-DEC 2009
19 SHWE PROJECT DAEWOO/HHI BASIC+DETAIL+FAB HVAC+PIPE FIXED PLATFORM APR 2009-APR 2010
20 GOLIAT PROJECT TOTAL/HHI DETAIL+FAB HVAC+PIPE LR FPSO JAN 2011-JUN 2012
21 Q204 PROJECT BP/HHI BASIC+DETAIL+FAB HVAC FPSO OCT 2011-AUG 2013
22 CLAIR RIDGE PROJECT BP/HHI FAB HVAC+PIPE FIXED PLATFORM APR 2013-JAN 2014
23 JANGKRIK PROJECT HHI DETAIL+FAB HVAC FPU FEB 2014-FEB 2015
24 BERGADING PROJECT HHI DETAIL HVAC PLATFORM APR 2015-FEB 2016
25 NASR 2 TOPSIDE PROJECT HHI DETAIL HVAC PLATFORM NOV 2015-JUL 2016
26 BADAMYAR PROJECT HHI DETAIL HVAC PLATFORM SEP 2015-JAN 2016
27 ROSEBANK HHI DETAIL PLUMBING FPSO OCT 2015-FEB 2016
28 NASR PKG-2(LQ) HHI DETAIL HVAC PLATFORM APR 2015-FEB 2016
29 BARONIA PROJECT HHI DETAIL PLUMBING PLATFORM MAR 2016-AUG 2016
30 NASR 2 TOPSIDE PROJECT HHI DETAIL PLUMBING PLATFORM MAR 2016-AUG 2016
31 NASR PKG2 Topside Plu HHI DETAIL HVAC SEP 2016-DEC 2016
32 NASR PKG2 HVAC Topside HHI DETAIL HVAC FEB 2017-APR 2017
33 PLUMBING HHI DETAIL PLUMBING PLUMBING

 조선 사업실적
SER. PROJECT NAME CLIENT/YARD SCOPE Part REMARKS Type PROJECT
PERIOD
1 1925 VLCC PROJECT(D/H) EURONAV/HHI DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE ABS+KR 318K APR 2008-JUN 2008
2 6,000 DWT ASPHALT TANKER VROON TANKERS/GEO FULL DESIGN PACKAGE HVAC+PIPE KR 60K DEC 2007-AUG 2008
3 1963 VLCC PROJECT(D/H) SK/HHI DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE ABS+KR 317K JAN 2008-APR 2008
4 82,000 CBM LPG(D/H) MISI/OPCE DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE MAR 2005-JUL 2005
5 1932 VLCC PROJECT(D/H) HHI DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE BV MAY 2008-JUL 2008
6 1006 SKID BARGE PROJECT HHI DESIGN PACKAGE HVAC+PIPE+ARCH+OUTFITTING KR SEP 2007-FEB 2008
7 1921 VLCC PROJECT(D/H) HHI DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE ABS+KR SHIP SEP 2007-JAN 2008
8 60K TLC BARGE PROJECT(ALL STX/OPCE DESIGN PACKAGE HVAC+PIPE+ARCH+OUTFITTING SKID BARGE SEP 2007-SEP 2008
9 2002 VLCC PROJECT(D/H) ASC/HHI DESIGN PACKAGE HVAC+ARCH+OUTFITTING ABS+KR DRILLING RIG SEP 2008-DEC 2009
10 1,800 DWT CLASS BULK CARRIER HHI HVAC+PIPE SHIP
11 1936 VLCC PROJECT(D/H) SK/HHI DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE SHIP

 육상 사업실적
SER. PROJECT NAME CLIENT/YARD SCOPE Part REMARKS Type PROJECT
PERIOD
1 UMM SHAIF PLATFORM ABU DHAB MARINE OPERATIONG CO(ADMA-OPCO)/HHI DESIGN PACKAGE HVAC+ARCH+OUTFITTING SKID BARGE SEP 2007-OCT 2008
2 SEEDRILL DRILING RIG PROJECT SEADRILL DESIGN PACKAGE(DETAIL DESIGN) HVAC RIG OCT 2006-MAY 2007
3 SAKHALIN 2B OPF EXXON NEFTEGAS LTE.,RUSSIA/HHI FULL DESIGN PACKAGE HVAC FIXED PLATFORM OCT 2005-SEP 2006
4 EGP 3A PLATFORM CHEVRON, NIGERIA LIMITED/HHI DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE FIXED PLATFORM OCT 2005-MAR 2006
5 EAST AREA EPC-1B P/F MOBIL PRODUCING NIGERIA UNLIMITED DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE FIXED PLATFORM OCT 2005-AUG 2006
6 WEST-ENS PROJECT(LQ) SHI DESIGN PACKAGE(DETAIL DESIGN) HVAC+PIPE POWER PLANT MAR 2007-SEP 2007
7 POSCO PROJECT POSCO/STEMP DESIGN PACKAGE STR+PIPE KR POWER PLANT MAR 2006-DEC 2006
8 EGP3-B PROJECT CHEVRON/HHI BASIC+DETAIL+FAB HVAC+PIPE FIXED PLATFORM JUN 2010-JUN 2011
9 GORGON PROJECT FABRICATION/HHI DETAIL+FAB HVAC POWER PLANT JAN 2011-JUN 2012
10 HEBRON PROJECT HHI DETAIL+FAB HVAC FIXED PLATFORM APR 2013-JUN 2015
11 RONG DOL PLATFORM KOREA NATIONAL OIL CORPORATION, VIETNA/HHI PACKAGE HVAC+ARCH+Elec POWER PLANT JAN 2014-JUN 2016
12 PETROSERV GVA 7500RILLING RIG PETROSERV S.A/DSME DETAIL+FAB HVAC POWER PLANT JAN 2015-SEP 2016
13 열처리 7 & 8 호기 HYOSUNG-VIETNAM DETAIL+FAB HVAC CAMICAL PLANT AUG 2017-OCT 2017
14 PETROSERV GVA 7500 RILLING RIG PETROSERV S.A/DSME DETAIL+FAB HVAC POWER PLANT JAN 2015-SEP 2016
15 방수훈련장비 동해 1함대사령부 DETAIL+FAB STR+HVAC+Pip+Elec+Outf. 훈련장비 SEP 2017-DEC 2017
16 전련1,2공장 환시 시스템 개선(기류,온도 시뮬레이션) LS-NIKKO FEED+BASIC+DCC HVAC CAMICAL PLANT AUG 2017-MAR 2018

ENGLISH       KOREAN

(주)에이스이앤티
TEL 052-233-0014 대표자 김대환
ADDRESS 울산광역시 중구 남외2길 30 정가B/D 5층
E-MAIL ace@aceent.co.kr
Copyright 2016 ACE ENGINEERING & TECHNOLOGY.Co.,Ltd All rights reserved